Success story
111 km link with NPX3

In the Amazon area of Peru we found a particularity that although the client refers that there is not much interference, he mentions that there is a great need to improve the traffic since this link is projected to give 1 Gb. A study was carried out with different platforms to verify the viability of the link since some tools as such indicated the null connection of the equipment, as shown in the following image.

estudio NPX3 de enlace 112 km

As part of the installation process, 2 towers were installed, the first at 12 metres, compensated by the height of point A in relation to point B, where 20 metres more were added, leaving a height of 60 metres on the tower. When initially hooking up, a signal of -80 was obtained due to the lack of alignment, as this was done with the Rocket M5 radios to locate the main lobe of both antennas.

torre netpoint
Netpoint en peru

Once the antennas were installed at both points, both antennas were successfully hooked together and very good signals were achieved. However, it was detected that there was a compromised fresnel line which will be improved to have a better transmission capacity than what the AirFiber 5XHD radios provide.

Enlace de 111 km Antenas NetPoint

About us

Subscribe to our newsletters

Netpoint | Antenas para WISP